The Reliable Wire, Volume 1, Issue 5 – September 2013

The dog days of August have slowed down the production of FERC, NERC, and WECC to the speed of a narrowed river in the waning days of summer. The flow will surely pick up in September as the kids head back to school and the fall rains begin to move in. There is a lot on the plates of our regulators this fall. In the meantime, there have been a few issues of note in August, two of which concern the Critical Infrastructure Protection standards.

[+] The Reliable Wire, Volume 1, Issue 5 – September 2013